Final Major Project Underway

architectural design, architecture, Art, Interior Design, university

I am now in my third year at Uni, (time has flown by so fast, I cannot quite believe it), and I am now working on my FMP. The site I chose to design is the Arnolfini mixed use building in Bristol, and I am re-imagining it as a new Art Gallery, using all of the space and reconfiguring the internal floors and roof areas.

This has been a really intense project so far, the scale of the building is vast and there are so many elements to consider. I made a sort of shopping list to remind myself of what I need to do / add/ remove and it grows daily as I work through the project.

My inspiration for the design comes from several areas; the building is set on the edge of the floating harbour and I loved the reflections of it in the water. From these I have designed panels and balustrading to use in the site.

The stonework on the building is beautiful, they have what is called vermicular rustication on the stone and I love the way the light plays on it. Taking negative shadows from the stone I have cast light through them. These also influenced the balustrading patterns.

The building was built originally to store tea in the booming trade in the 1830’s and which was expected to be stored in Bristol, but by the time it was completed, the tea trade had moved to London. Known as Bush House, the site became an iron foundry and then a bonded warehouse. Research into this trade has given me lots of ideas, especially using the pattern of shipping lines used for the original intention of Bush House.

Tea Trade Route Lines

These lines will be manipulated into design ideas within the site.

I have had some great finds in my research, done a poll with local residents and had interviews with curator/gallery head experts like Sir Nicholas Serota, Sir Nicholas Penny & Patrick Elliot who have helped me realise what is needed in such a large gallery to make it successful. I will post more as I go…

Advertisement